New Report Provides Insights on Setting up a Biomass Gasification Plant - Beckley, Bluefield & Lewisburg News, Weather, Sports

New Report Provides Insights on Setting up a Biomass Gasification Plant

Posted: Updated:
  • Local NewsLocal NewsMore>>

  • Deadly shooting at a large party in Beckley

    Man dies after a Shooting during a Party outside of Beckley, Now the Search is On for the Suspect

    Man dies after a Shooting during a Party outside of Beckley, Now the Search is On for the Suspect

    Sunday, September 14 2014 3:10 PM EDT2014-09-14 19:10:52 GMT
    The Raleigh County Sheriff's office responded to a shooting at a party just outside of Beckley early Sunday morning. As a result of these gunshots, Roland Howard Frazier, 23, was hit and later died.
    The Raleigh County Sheriff's office responded to a shooting at a party just outside of Beckley early Sunday morning. As a result of these gunshots, Roland Howard Frazier, 23, was hit and later died.
  • UPDATE: Beckley Police catch suspects involved in shooting on Summers Street

    UPDATE: Beckley Police catch suspects involved in shooting on Summers Street

    Sunday, September 14 2014 2:48 PM EDT2014-09-14 18:48:51 GMT
    After 19 year-old Tyrell Smith was shot twice on his hip and wrist, the suspects have been found. Detective Bragg with the Beckley Police Department said they quickly got tips as to where the suspects were. Once they found the vehicle near Antonio street, there was a short pursuit, then police caught the suspects.
    After 19 year-old Tyrell Smith was shot twice on his hip and wrist, the suspects have been found. Detective Bragg with the Beckley Police Department said they quickly got tips as to where the suspects were. Once they found the vehicle near Antonio street, there was a short pursuit, then police caught the suspects.
  • A Tazewell County Mother Says Eric Smith Will Not Be Forgotten 10 Months After His Disappearance

    A Tazewell County Mother Says Eric Smith Will Not Be Forgotten 10 Months After His Disappearance

    Saturday, September 13 2014 8:51 PM EDT2014-09-14 00:51:17 GMT
    It's been ten months since a man was reported missing in TazewellCounty.Police said Eric Smith, a General Mine Foreman at Buchanan Mine No. 1 in Buchanan County,Virginia,was reported missing onNovember 8, 2013after he failed to return home from a hunting trip.Eric Smith's mother, Dreama Smith, said she will never let Eric be forgotten.Dreama said, "We pray everyday that something will open."Cedar Bluff Police Chief, David Mills, said they are constantly checking leads.Mills said, "Everyday so...
    It's been ten months since a man was reported missing in TazewellCounty.Police said Eric Smith, a General Mine Foreman at Buchanan Mine No. 1 in Buchanan County,Virginia,was reported missing onNovember 8, 2013after he failed to return home from a hunting trip.Eric Smith's mother, Dreama Smith, said she will never let Eric be forgotten.Dreama said, "We pray everyday that something will open."Cedar Bluff Police Chief, David Mills, said they are constantly checking leads.Mills said, "Everyday so...
“Prefeasibility Report on a Biomass Gasification Plant”
A new report released by IMARC Group provides a techno-commercial roadmap for setting up a biomass gasification plant. This ranges from macro overview of the market to micro details of the industry performance, processing and manufacturing requirements, project cost, project funding, project economics, infrastructure requirements, revenues, expected returns on investment, profit margins, etc.

IMARC’s latest study “Prefeasibility Report on a Biomass Gasification Plant” provides a techno-commercial roadmap for setting up a biomass gasification plant. The study, which has been done by one of the world’s leading research and advisory firms, covers all the requisite aspects of the biomass gasification industry. This ranges from macro overview of the market to micro details of the industry performance, processing and manufacturing requirements, project cost, project funding, project economics, expected returns on investment, profit margins, etc. This report is a must-read for entrepreneurs, investors, researchers, consultants, business strategists and all those who are planning to foray into the biomass gasification industry in any manner.

Key Questions Answered in This Report?

  • What are the key success and risk factors in the biomass gasification industry?
  • How has the biomass gasification market performed so far and how will it perform in the coming years?
  • What is the structure of the biomass gasification industry and who are the key players?
  • What are the various unit operations involved in a biomass gasification plant?
  • What is the total size of land required for setting up a biomass gasification plant?
  • What are the machinery requirements for setting up a biomass gasification plant?
  • What are the raw material requirements for setting up a biomass gasification plant?
  • What are the utility requirements for setting up a biomass gasification plant?
  • What are the manpower requirements for setting up a biomass gasification plant?
  • What are the infrastructure costs for setting up a biomass gasification plant?
  • What are the capital costs for setting up a biomass gasification plant?
  • What are the operating costs for setting up a biomass gasification plant?
  • What will be the income and expenditures for a biomass gasification plant?
  • What is the time required to break-even?


Table of Contents

1 Research Methodology
2 Executive Summary
3 Introduction
4 Biomass Gasification: Industry Analysis
4.1 Biomass Gasification Industry: Key Success and Risk Factors
4.2 Biomass Gasification Industry: Overall Market Performance
4.2.1 Global Power Generation Market
4.2.1.1 Historical and Current Market Trends
4.2.1.2 Market by Source
4.2.1.3 Market by Region
4.2.2 Global Biomass Power Generation Market
4.2.2.1 Historical and Current Market Trends
4.2.2.2 Market by Source
4.2.2.3 Market by Region
4.2.3 Market Outlook
4.2.4 Key Players
5 Biomass Gasification Process
5.1 Biomass Gasification Plant: Detailed Process Flow
5.2 Biomass Gasification Plant: Various Types of Unit Operations Involved
6 Project Details, Requirements and Costs Involved
6.1 Land, Location and Site Development
6.2 Plant Machinery
6.3 Raw Materials
6.4 Utilities
6.5 Manpower
6.6 Other Capital Investments
7 Biomass Gasification Plant: Loans and Financial Assistance
8 Biomass Gasification Plant: Project Economics
8.1 Capital Cost of the Project
8.2 Techno-Economic Parameters
8.3 Pricing
8.4 Income Projections
8.5 Expenditure Projections
8.6 Financial Analysis

List of Figures

Figure 4.1: Global: Electricity Production (in TWh), 2009-2013
Figure 4.2: Global: Electricity Production: Breakup by Source (in %), 2013
Figure 4.3: Global: Electricity Production: Breakup by Region (in %), 2013
Figure 4.4: Global: Biomass Electricity Production (in TWh), 2009-2013
Figure 4.5: Global: Biomass Electricity Production: Breakup by Source (in %), 2013
Figure 4.6: Global: Biomass Electricity Production: Breakup by Region (in %), 2013
Figure 4.7: Global: Electricity Production Forecast (in TWh), 2014-2019
Figure 4.8: Global: Biomass Electricity Production Forecast (in TWh), 2014-2019
Figure 5.1: Biomass Gasification Process: Conversion Rates of Products and By Products
Figure 5.2: Biomass Gasification Process
Figure 8.1: Biomass Gasification Plant: Breakup of Capital Costs (in %)
Figure 8.2: Biomass Gasification Plant: Breakup of Operating Costs (in %)

List of Tables

Table 4.1: Global: Major Biomass Gasifiers and their Capacities (in MWh)
Table 6.1: Biomass Gasification Plant: Costs Related to Land and Site Development (in US$
Table 6.2: Biomass Gasification Plant: Costs Related to Civil Works (in US$)
Table 6.3: Biomass Gasification Plant: Machinery Costs (in US$)
Table 6.4: Biomass Gasification Plant: Raw Material Requirements (in Tons/Day)
Table 6.5: Biomass Gasification Plant: Costs Related to Salaries and Wages (in US$
Table 6.6: Biomass Gasification Plant: Costs Related to Other Capital Investments (in US$)
Table 7.1: Details of Financial Assistance Offered by Financial Institutions
Table 8.1: Biomass Gasification Plant: Capital Costs (in US$)
Table 8.2: Biomass Gasification Plant: Techno-Economic Parameters
Table 8.3: Biomass Gasification Plant: Income Projections (in US$)
Table 8.4: Biomass Gasification Plant: Expenditure Projections (in US$)
Table 8.5: Biomass Gasification Plant: Cash Flow Analysis Without Considering the Income Tax Liability
Table 8.6: Biomass Gasification Plant: Cash Flow Analysis on Considering the Income Tax Liability


To buy the complete report or to get a free sample, please contact:

IMARC Group Asia:
Email: apac@imarcgroup.com
Phone: +91-120-415-5099

IMARC Group North America:
Email: america@imarcgroup.com
Phone: +1-631-791-1145

IMARC Group Europe, Middle East & Africa:
Email:ema@imarcgroup.com
Phone: +44-702-409-7331


To know more please visit:
http://www.imarcgroup.com/prefeasibility-report-biomass-gasification-plant/

Media Contact
Company Name: IMARC Group
Contact Person: Krishna Sharma
Email: Send Email
Phone: +91-120-415-5099
City: Noida
State: Uttar Pradesh
Country: India
Website: http://www.imarcgroup.com/

Source: www.abnewswire.com

ReleaseID: 13670